中文版ACEI website
Examples
Geotechnique

Pile and soil

Through secondary development of MatDEM, discrete element model of pile-soil action is quickly established.The simulation ran on a laptop and took 10 minutes to compute.

The figure below shows the vertical stress during the piling process, and the elastic stress wave reflected from the pile bottom can be seen.See the software example BoxPile.

桩土.jpg

Secondary development modeling code for pile-soil action running in MatDEM

桩土代码.jpg

The drawing process of 195,000 units was simulated, which took 10 hours.Applying step-by-step upward displacement to the pile with each upward movement of 0.5mm, we can see the elastic stress wave on the pile.


Simulation of drawing pile process, horizontal stress force (after stress balance)

 

Larger models, including 250,000 units.The pressure waves generated when the pile was put in were clearly visible.